TEPCOLightning Protection Systems

BS EN/IEC 62305-2 LPS Risk Assessment Calculator

BS EN 62305-2 risk inputs, protection selection, and calculation result.

Log In

Database access

Project Dashboard

Restore Deleted Projects

Recover projects from database backup files

User Management

Create users in the database

Generate Report

Report Standard Edition

Select the standard reference shown in generated reports

Select a supported standard edition to display the project and risk-assessment parameter fields.

Project Information

Basic report details

Risk Selection

Select risks to be evaluated

BS EN 62305-2:2012 UK Annex NF tolerable risks: R1 = 1E-5, R2 = 1E-3, R3 = 1E-4. Note 1) applies to life-critical internal-system failures. Note 2) applies only where animals may be lost.

Structure and Lightning Density

Primary geometry and strike exposure inputs

Select source to apply Annex A.1 formula.

Adjacent structure at far end

Parameters for NDJ when a structure is connected to the far end of the line

Connected Lines

Incoming power, telecom, and data services

Zones of Protection / Loss Factors

Occupancy, time, probability, and loss factors
PM
Protection Measures

Selected Protection Measures

Status Automatic calculation will show the selected protection result.
PBLightning Protection System for R1
SPDService and Data Line Protection for R2

Summary Result

Risk comparison with and without protection
Enter parameters and the result will update automatically.

Detailed Calculation

Component values in clause 4.3 order